After an EEG/ERP test has been completed, selecting the node below the test order will give access to the test results.
![1](drex_bullet_1_3.png) Test Result
Highlight desired test to display results
Click the Node by the dated test order to display configurations
|
|
![2](drex_bullet_2_3.png) Test Configuration Info
Name
|
Displays Configuration Name
|
Target
|
Displays target of study
|
Description
|
Provides more detailed info on test configuration
|
|
|
![3](drex_bullet_3_3.png) Configuration Outcomes
Success
|
Configuration was successfully uploaded
|
Max Errors
|
Configuration exceeded maximum errors and was not fully uploaded
|
Power Failure
|
HCU device ran out of battery during test session
|
Max Resting Threshold Exceeded
|
|
|
|
|
|
![4](drex_bullet_4_3.png) Target
|
|
![5](drex_bullet_5_3.png) View EEG/ERP Data
Data-Set ID
|
Numeric ID assigned to data-set
|
Date Uploaded
|
Displays when test was uploaded
|
|
|
![6](drex_bullet_6_3.png) System Information
Displays the serial number and firmware version for the HCU and Harness used to perform the test.
|
|